The ACB Solution
Following consultation with ExEllison Switchgear Services Ltd we embarked on a programme of replacing the ACBs with a modern units including integral protection units.
ExEllison Switchgear Services Ltd utilises the latest 3D solid modelling CAD systems to design its products to ensure a first-time fit every time. We have developed standard arrangements for a wide variety of ACB replacements.In this case Mitsubishi ACBs were utilised. The interface was designed to allow installation into the existing panel with the minimum of modification and down-time.
A full assembly kit was supplied with no need for cutting and carving of parts to suit on site. Only the experience ExEllison have can guarantee a first-time fit without the need for a shutdown in advance of the installation.
Note that ExEllison Switchgear Services Ltd does not install an Air Circuit Breaker into an existing ACB chassis. There is little point in replacing an ACB whilst still relying on aged contact finger clusters. We take the old ACB out completely right back to the basic connections. This weak point is removed to ensure the integrity of the new assembly.
Typically the removal of 2 incoming ACBS and a bus-section ACB and the installation of new replacement ACBs is completed within an 8-hour shutdown. In this case the three main ACBs were replaced in a planned 12-hour shutdown—with 3 hours to spare. The opportunity was taken to upgrade the metering by fitting multi-function metering integrally to the new modules.
ExEllison’s unique design ensures perfect alignment of copperwork with no cutting on site. CTs can be fitted within the new module to supply the new metering. Fuse fed voltage references are also encorporated.
Internal shrouding is fitted to make the ACB module complete. A fully shuttered Cassette is used to ensure the operators safety
The installation is completed and the equipment returned to service following ACB testing. The equipment is now suitable for continued use at a fraction of the cost of a replacement switchboard and all of the associated civil and cabling works.
ExEllison’s unique design ensures perfect alignment of copperwork with no cutting on site. CTs can be fitted within the new module to supply the new metering. Fuse fed voltage references are also encorporated.
Internal shrouding is fitted to make the Air Circuit Breaker module complete. A fully shuttered Cassette is used to ensure the operators safety.
The installation is completed and the equipment returned to service following ACB testing. The equipment is now suitable for continued use at a fraction of the cost of a replacement switchboard and all of the associated civil and cabling works.
For Further information on ACB replacements or our other services contact us at enquiries@exellison.co.uk or Tel 01902 632639. Mob 07786 350764, 07973 563855.